Thanks to the “interlocking” system used by the firm that is building the clinic, the construction works go on rapidly. In fact both the supporting structure and the walls have been erected.
We have used concrete only for the foundation, while the materials used for the interior are wood and plasterboard (apart from ecologic insulators such as cellulose) that will grant a low environmental impact and energy saving. Meanwhile we also prepared all the water connections in the various rooms.

The challenge now is to close all the exterior windows and doors as soon as possible, to prevent the rains – that have already fallen abundantly – or the snow (which may fall soon) to seep into the building.